19 October

Trash Talk- waste charging scheme 電台訪問:垃圾徵費條例

Paul Zimmerman: ‘… recycling materials are not high value but they are high cost once they get into the waste system. The landfills are full. Do we need new landfill? If yes, then where is the land? Is it going to be country parks? People don’t realize waste charging has lots of implications …’

司馬文:回收物的價值不高,但它們一旦進入廢物鏈或堆填區,它們的成本卻很高。堆填區快將滿。我們需要新的堆填區嗎?如果是,那土地來源哪裏來?是郊野公園嗎?很多人沒有意識到垃圾徵費其實隱含着極大的意義……

https://podcast.rthk.hk/podcast/item.php?pid=1432&lang=zh-CN
trash talk

Support waste charging and improve municipal solid waste management

Please join our Petition: https://www.supporthk.org/?petition=lets-improve-our-municipal-solid-waste-management&lang=en

徵費、源頭分類、回收
三大元素,決一不可

要有效解決每日人均垃圾棄置量,請聯署支持垃圾徵費

https://www.supporthk.org/?petition=%E6%94%B9%E5%96%84%E9%83%BD%E5%B8%82%E5%9B%BA%E9%AB%94%E5%BB%A2%E7%89%A9%E7%AE%A1%E7%90%86

18 October

Support waste charging and improve municipal solid waste management 支持修訂垃圾徵費條例草案,改善城市固體廢物管理

https://www.supporthk.org/?petition=lets-improve-our-municipal-solid-waste-management&lang=en
Waste Levy, Source Separation, Recycling – 3 elements, not one less.

We urge the Government to consider the suggested key actions in 2020 Policy Address with the aims of improving and support the municipal solid waste management and recycling in Hong Kong.

Please sign our petition so we can reduce the volume of daily disposal of garbage.

徵費、源頭分類、回收
三大元素,決一不可

我們敦促政府通過廢物回收和公眾教育,支持修訂垃圾徵費條例草案,改善城市固體廢物管理。

要有效解決每日人均垃圾棄置量,請支持聯署

區議員聯署:https://docs.google.com/forms/d/e/1FAIpQLSdfolxAs44alWP0_dRCEAg_HS9gLB5s9MJA_sMXHDLqYr0LkA/viewform

16 October

聯署支持修訂垃圾徵費條例草案,改善都市固體廢物管理 Let’s approve municipal solid waste charging

徵費、源頭分類、回收
三大元素,決一不可

議員聯署https://docs.google.com/forms/d/e/1FAIpQLSdfolxAs44alWP0_dRCEAg_HS9gLB5s9MJA_sMXHDLqYr0LkA/viewform
公眾聯署https://www.supporthk.org/?petition=%E6%94%B9%E5%96%84%E9%83%BD%E5%B8%82%E5%9B%BA%E9%AB%94%E5%BB%A2%E7%89%A9%E7%AE%A1%E7%90%86

3elementsWhatsApp Image 2020-10-16 at 3.53.22 PM
政府曾在2013年制定目標,務求「在2022年將每日人均垃圾棄置量減至0.8公斤」。然而,垃圾棄置量不跌反升,更在2018年創新紀錄,每日人均垃圾棄置量達到1.53公斤。現有的回收計劃無法提高回收量,例如PET膠樽的出口回收率從8.5%(2016)大幅降至0.23%(2018)。三個戰略性堆填區面臨巨大壓力,並快將於2020年代末飽和。如果再不採取行動減少都市固體廢物,我們可能只靠覓地,以容納更多焚化爐或興建第四個堆填區,甚至犧牲郊野公園土地。屆時,我們需要作出更具政治敏感的決策。

垃圾徵費是政府回收塑膠和廚餘等廢物的相關政策的關鍵。回收、源頭分類和徵費是解決都市固體廢物的三大重要元素,決一不可。對比其他司法管轄區,香港的垃圾管理已大大落後。以往很多相關政策措施都是空談。延遲推出垃圾徵費將帶來不可想像的後果。如果垃圾徵費未能在來年施政處理,則只能在3-5年後重提。都市固體廢物將無法重大改善。

為改善香港的都市固體廢物管理,政府需採取以下的策略:
1. 應用策略於每種香港都市固體廢物 (立法會資料研究組,2019年): 廚餘 (34%)、廢紙 (24%)、塑膠垃圾 (20%) 和其他垃圾 (23%);
2. 應用「污者自付」、「源頭分類」 和 「生產者責任計劃」三大政策工具及理念,以解決都市固體廢物問題;
3. 每年撥款約8 至10 億元支持本地回收業,推動不同的減廢及回收措施;
4. 把垃圾徵費所得的資金用於本地回收業,達至可持續發展;

在採取垃圾徵費同時,創建香港建議以下廚餘和塑膠回收的相關措施:

立法規管和增加設施,以支持回收和廢物管理:
1. 將廚餘回收網絡擴展至全港18個區的食環署垃圾收集站和公屋;
2. 向各區私人屋苑提供資源、經濟誘因和定期維修服務,並為承辦商員工提供培訓,以達至可持續廚餘回收;
3. 投資廚餘回收技術,為回收業創造更多職位空缺,例如物流運輸和技術支援;
4. 提升公民減廢意識,教育公眾分類廚餘;

塑膠回收
1. 擴展「塑膠可回收物料回收服務先導計劃」至全港18區,推動公眾進行回收;
2. 就即棄膠樽實施生產者責任制;
3. 檢管即棄餐具;
4. 禁止在個人護理產品中使用微塑膠;
5. 禁止使用發泡膠盒;
6. 檢管食品過度包裝;
7. 檢視現有的公共飲水機的衛生情況,務求在肺炎疫情下,巿民能安心使用飲水機,並建立公共飲水機網絡。

WhatsApp Image 2020-10-16 at 3.52.36 PMlandfill is full

Let’s approve municipal solid waste charging

Waste Levy, Source Separation, Recycling – 3 elements, not one less
DC/LC member petition:  https://docs.google.com/forms/d/e/1FAIpQLSdfolxAs44alWP0_dRCEAg_HS9gLB5s9MJA_sMXHDLqYr0LkA/viewform

Public Petition:   https://www.supporthk.org/?petition=lets-improve-our-municipal-solid-waste-management&lang=en

Background

In 2013, the government set the goal of ‘reducing the volume of daily disposal of garbage per capita to 0.8 kg in 2022’. Yet, per capita daily disposal of municipal solid waste (MSW) continues to increase every year. A record high of 1.53kg was reached in 2018. Under the current programs, recycling fails to improve. For example the export recycling rate of PET bottles fell from 8.5% (2016) to 0.23% (2018). Our three strategic landfills are under pressure and are about to saturate this decade. If nothing more is done to reduce MSW, we may have to explore new sites for incinerators or landfills. This would likely impact our country parks. Once the landfills are full, it will be politically difficult to stop this from happening.

The MSW Bill enabling charging is the linchpin in government’s waste policy and projects. Waste levies are important in promoting source separation of domestic waste and the successful expansion of our recycling capacity. Without waste charging, the separation and reduction of waste and the recovery of useful materials for recycling will fail. Hong Kong’s waste reduction management is already lagging behind other jurisdictions. Many policy initiatives have turned into broken promises. The delay of the waste charging bill will make it ever more difficult to achieve high levels of recycling. If the Bill is not dealt with within this term of government, the Bill will be delayed by 3-5 years. This unacceptable.

 

Improving Hong Kong’s municipal solid waste management requires key actions in the Policy Address:

  1. Strategies to address all types of municipal solid waste in Hong Kong (LegCo research paper, 2019): food waste (34%), paper waste (24%), plastic waste (20%) and others (23%);
  2. Reconfirm the principles: Polluters Pay, Source Separation of Waste, and Producers’ Responsibility;
  3. Allocate HKD 800-1000 million for waste reduction and recycling; and
  4. Apply the funds generated from waste charging in support of the recycling industry.

 

Implement legislation, regulations and infrastructure in support of recycling and waste management:

  1. Extend the collection network of food waste collection across 18 districts, to all FEHD Refuse Collection Point and public housing estates;
  2. Allocate resources and financial incentives for maintenance and contractor staff training for food waste collection in all private housing estates;
  3. Invest in food waste technology and create more jobs in recycling industry, e.g. logistic and technical support for food waste collection services;
  4. Educate the public on waste reduction and separation of food waste.

 

Plastic waste recycling

  1. Extend the pilot schemes of plastic collection to all 18 districts to provide convenience to the public;
  2. Implement the producer responsibility system for beverage (disposable) containers;
  3. Retrofit and expand public water dispensers for hygienic and COVID-proof bottle refilling;
  4. Regulate disposable tableware;
  5. Regulation of excessive packaging of food products;
  6. Ban the use of styrofoam and microplastic in personal care products
6 October

Topside development on XRL – Survey Result

no height relaxation

We conducted a public opinion survey between September 28th to October 6th regarding the captioned application. 143 people submitted their responses.

The majority of the respondents objected expressing concerns over the relaxation of building height restrictions, deteriorating air ventilation, urban heat island effect, daylight access and visual intrusion.

By Friday Oct 9, please submit your comments to Town Planning Board at https://www.info.gov.hk/tpb/tc/plan_application/A_K20_133.html

廣深港高速鐵路西九龍總站用地

擬議辦公室、商業及零售發展並放寬建築物高度限制 (申請編號: A/K20/133)

9月28日至10月6日我們就以上題目,進行了公眾諮詢,並共有143人提交了回覆。

大部分受訪者表示反對放寬建築物高度限制,擔心會令空氣不流通,加劇城市熱島效應,影響日光和視覺效果。

請在10月9日之前向城市規劃委員會發表意見,或加入條件限制。你的意見可能會影響最終建築設計,從而改善社區發展。

  1. 62.94% of the respondents objected to the reflective exterior glass surface as it creates a glare which impairs the enjoyment of neighboring residents including particularly The Waterfront and The Austin. The glare may also impact nearby traffic. Solar reflections also raise temperatures and may impact vegetation nearby. Concerns were expressed over energy consumption for air-conditioning. The design is deemed does not match with the surrounding buildings.
  1. 71.33% of respondents are concerned over traffic impacts along Nga Cheung Road, Jordan Road and Canton Road. The proposed scheme proposed no less than 550 parking spaces for private cars. With the increase in parking spaces here and the car park at To Wah Road together with other developments in the area as well as new road connections such as the Central Kowloon Route, it is unclear whether the traffic burden exceeds capacity. Traffic congestion (and associated blaring of car horns) is experienced often in the area including along Jordan Road.
  1. 70.63% of respondents are concerned over the relaxation of building heights and the close distance between The Waterfront and XRL topside development. Such building structure would disturb daylight access, visual quality and air ventilation to inner area in Jordan.
  1. 76.22% of people object to relaxing height limit as this will set a bad precedent for nearby sites including future buildings at the WKCD. This application will set a precedent for others to change height restrictions. Respondents wonder if there is any justification of relaxing height limit after developers won bids for a site. Moreover, there is no compensation for the losses suffered by nearby residents. The gain would be simply for the developer at the cost of the neighbours.
  1. Although it is claimed that the proposed design has better air ventilation than the original scheme, 71.33% of respondents are concerned over the impact of having less fresh air and that pollutants residue in the community. It must be noted that the developer has failed to meet and consult the neighbours on the proposed plans.
  1. 49.65% of the respondents are worried over food and beverage related noise control at site, and the absence of clear operating guidelines on the use of facilities and time control of activities at the catering and commercial facilities (64.34%).
  1. 81.82% of the respondents are concerning over delivery of the promised public space. The promised public spaces are absent from the land lease conditions and may not be delivered. As seen throughout Hong Kong, what is promised in terms of public gains including public space, accessibility, public recreation, alfresco dining, etc, fails to be delivered. What controls will be applied by the Town Planning Board to ensure promised made are delivered?
  1. 86.71% of the respondents are upset with the lack of consultation and the failure to present and discuss the plans with nearby residents. Residents received insufficient information regarding the revised plans. Public consultation should have been conducted to provide clear information and to gain a better understanding. Moreover, the developer should introduce and discuss the proposal with the District Council before the deadline for comments under the Town Planning Ordinance for the captioned application.
  1. In the survey conducted, there is a demand for assessment of sustainability performance in terms of creating a ‘public realm’ which delivers a holistic and positive impact for occupants and neighbours. Reference is made to HKGBC BEAM Plus Neighborhood. More than 70% of respondents suggest civic spaces to be used by non-profit organizations for community activities (76.92%), promoting gender equality by introducing ‘Gender Mainstreaming checklist’ into the design and construction of the development (70.63%), and by adopting pet-friendly (78.32%) and bicycle-friendly measures (77.62%) for the site as well as the connections with the West Kowloon Cultural District to Jordan, Yau Ma Tei and Tai Kwok Tsui.
  2. 93.01% of respondents support environmental protection initiatives, such as energy saving, water use and reuse, using recyclable building materials, installing waste management and treatment facilities, etc. To implement initiatives to improve energy efficiency, environmental performance and achieving Government’s energy saving plan by 2025, all new development should have set goal to achieve HKGBC Beam Plus.
28 September

Public Consultation for Topside Development on XRL 高鐵站上蓋發展意見調查

XRL comparsion

new design

Designing Hong Kong Public consultation

Designing Hong Kong and a few Yau Tsim Mong District Council members would like to collect your views on the topside development on XRL.

Sun Hung Kai Properties submitted a re-application of building’s design and structure (Application No. A/K20/133) under section 12 (a) of the Town Planning Ordinance. If you have any concerns, please take this chance to comment to the Town Planning Board by Oct 9th.  Your views may improve the final design of the development.

Click here for the submission to Town Planning Board (deadline on Oct 09)

Click here for Designing Hong Kong public consultation

Click here for Proposed Topside Development by Masterplan Limited

Click here for Paper of the proposed Topside Development

For enquiry, please contact us at [email protected]

高鐵站上蓋發展意見調查

創建香港和油尖旺區議會議員希望就高鐵站上蓋發展收集你的意見。

新鴻基地產根據《城市規劃條例》第12(a)條提交了建築物的設計和結構的申請(申請編號A / K20 / 133)。請在10月9日之前向城市規劃委員會發表意見,或加入條件限制。你的意見可能會影響最終建築設計,從而改善社區發展。

改劃申請書及文件:請按此

意見調查:請按此

領賢規劃顧問有限公司提供的簡報(只備英文版):請按此

擬議西九龍站上蓋發展會議文件(只備英文版):請按此

 

24 September

Shek O lovers’ bridge – Survey Result 石澳情人橋民意調查結果

Original

Original

 

Final Q1

Thank you those who participated in our online survey!

A public opinion survey was conducted from 18-20 September 2020. More than 70% of the 813 respondents objected to steel railings and preferred a simple concrete bridge. 103 local Shek O residents voted, with 70 objecting to steel railings. Overall, only 21.3% of the respondents supported steel railing designs (option #2 or #3). However, 138 people offered suggestions explaining that they preferred:

  1. A design which blends in better with the natural environment by using a granite stone finishing or softening the blue colour;
  2. Widen the bridge and approach paths, and add space for safe gathering, photo taking;
  3. Enable any water to run off quickly and ensure a non-slippery bridge deck;
  4. Soft solar lights/ LED lights to ignite during nights;
  5. Improved signage about the bridge could be considered.

Other comments:

  • Enable people to put ‘lover locks’
  • Heart shape openings in the structure
  • Photo spots / observation areas (bridge is too narrow for photo taking)
  • Seating, shade and washroom in the vicinity
  • LED lighting to make it photogenic at night
  • Dim solar lights along the bridge and path
  • Railings to assist elderly to walk to and from the bridge
  • Graffiti wall
  • Signage with information about the history of ‘Shek O lovers’ bridge
  • A coin operated telescope

Other proposed options:

  • blue 1 new

    Option One: Concrete bridge (close to the original)

    blue2

    Option two: Steel Bridge

    blue3

    Option Three: More steel bridge

    感謝各位參與網上問卷調查,提供你們寶貴的意見!
    2020年9月18日至20日我們進行了一項民意調查。813名受訪者中有70%以上反對鋼欄杆,並傾向使用簡單的混凝土橋。 103位石澳居民投票,其中70位反對鋼欄杆。總體而言,只有21.3%的受訪者支持鋼欄杆設計(選項2或3)。138人提出寶貴的意見,希望混凝土設計的橋更有地道特色:
    1.使用花崗岩石或柔和藍色系,使設計更融合自然環境;
    2. 擴闊橋樑和出入口路徑,提供空間讓人聚集,和拍照相片;
    3. 設計應確保雨水能迅速流走,橋面亦要防滑;
    4. 選擇柔和的太陽能燈/ LED燈在夜間點亮;
    5. 考慮改善有關情人橋歷史由來的路牌和路標。

    其他建議:

    • 可掛情人鎖
    • 橋身加設心形開口設計
    • 攝影點/遊客觀光區(現時橋身太窄,無法拍照)
    • 情人橋附近增設座位,陰涼處和洗手間
    • LED照明方便夜間拍攝
    • 沿橋樑和路徑增設太陽能燈
    • 增設欄杆,方便老年人步行
    • 塗鴉牆,繪畫藝術
    • 標示有關石澳情人橋歷史的標牌
    • 投幣式望遠鏡
      Samples suggested

      Samples suggested