23 October

青衣出行 Commute in TY

按此瀏覽「青衣出行」網頁
Click here to visit the website of Commute in TY

「⻘⾐出⾏」是⼀個由創建香港與葵青區議會社區營造工作小組合辦、由葵⻘區議會資助的社區項⽬,⽬的是在⻘⾐島推廣單⾞作為⽇常通勤的交通⼯具。這次項⽬旨在透過實地研究和舉辦社區活動,研究在⻘⾐區內可行的單⾞通勤路線,並教育不同道路使⽤者和公眾有關騎單⾞的文化禮儀和安全意識。

Commute in TY is a community project co-organized by Designing Hong Kong and the Community Building Working Group of the Kwai Tsing District Council. The project is funded by the Kwai Tsing District Council to promote cycling as a transportation mode for daily commute on Tsing Yi Island. The project aims to investigate and propose a cyclists’ commuting path in Tsing Yi, and to educate different road users and the public on the safety of cycling in Tsing Yi.

6 October

Topside development on XRL – Survey Result

no height relaxation

We conducted a public opinion survey between September 28th to October 6th regarding the captioned application. 143 people submitted their responses.

The majority of the respondents objected expressing concerns over the relaxation of building height restrictions, deteriorating air ventilation, urban heat island effect, daylight access and visual intrusion.

By Friday Oct 9, please submit your comments to Town Planning Board at https://www.info.gov.hk/tpb/tc/plan_application/A_K20_133.html

廣深港高速鐵路西九龍總站用地

擬議辦公室、商業及零售發展並放寬建築物高度限制 (申請編號: A/K20/133)

9月28日至10月6日我們就以上題目,進行了公眾諮詢,並共有143人提交了回覆。

大部分受訪者表示反對放寬建築物高度限制,擔心會令空氣不流通,加劇城市熱島效應,影響日光和視覺效果。

請在10月9日之前向城市規劃委員會發表意見,或加入條件限制。你的意見可能會影響最終建築設計,從而改善社區發展。

  1. 62.94% of the respondents objected to the reflective exterior glass surface as it creates a glare which impairs the enjoyment of neighboring residents including particularly The Waterfront and The Austin. The glare may also impact nearby traffic. Solar reflections also raise temperatures and may impact vegetation nearby. Concerns were expressed over energy consumption for air-conditioning. The design is deemed does not match with the surrounding buildings.
  1. 71.33% of respondents are concerned over traffic impacts along Nga Cheung Road, Jordan Road and Canton Road. The proposed scheme proposed no less than 550 parking spaces for private cars. With the increase in parking spaces here and the car park at To Wah Road together with other developments in the area as well as new road connections such as the Central Kowloon Route, it is unclear whether the traffic burden exceeds capacity. Traffic congestion (and associated blaring of car horns) is experienced often in the area including along Jordan Road.
  1. 70.63% of respondents are concerned over the relaxation of building heights and the close distance between The Waterfront and XRL topside development. Such building structure would disturb daylight access, visual quality and air ventilation to inner area in Jordan.
  1. 76.22% of people object to relaxing height limit as this will set a bad precedent for nearby sites including future buildings at the WKCD. This application will set a precedent for others to change height restrictions. Respondents wonder if there is any justification of relaxing height limit after developers won bids for a site. Moreover, there is no compensation for the losses suffered by nearby residents. The gain would be simply for the developer at the cost of the neighbours.
  1. Although it is claimed that the proposed design has better air ventilation than the original scheme, 71.33% of respondents are concerned over the impact of having less fresh air and that pollutants residue in the community. It must be noted that the developer has failed to meet and consult the neighbours on the proposed plans.
  1. 49.65% of the respondents are worried over food and beverage related noise control at site, and the absence of clear operating guidelines on the use of facilities and time control of activities at the catering and commercial facilities (64.34%).
  1. 81.82% of the respondents are concerning over delivery of the promised public space. The promised public spaces are absent from the land lease conditions and may not be delivered. As seen throughout Hong Kong, what is promised in terms of public gains including public space, accessibility, public recreation, alfresco dining, etc, fails to be delivered. What controls will be applied by the Town Planning Board to ensure promised made are delivered?
  1. 86.71% of the respondents are upset with the lack of consultation and the failure to present and discuss the plans with nearby residents. Residents received insufficient information regarding the revised plans. Public consultation should have been conducted to provide clear information and to gain a better understanding. Moreover, the developer should introduce and discuss the proposal with the District Council before the deadline for comments under the Town Planning Ordinance for the captioned application.
  1. In the survey conducted, there is a demand for assessment of sustainability performance in terms of creating a ‘public realm’ which delivers a holistic and positive impact for occupants and neighbours. Reference is made to HKGBC BEAM Plus Neighborhood. More than 70% of respondents suggest civic spaces to be used by non-profit organizations for community activities (76.92%), promoting gender equality by introducing ‘Gender Mainstreaming checklist’ into the design and construction of the development (70.63%), and by adopting pet-friendly (78.32%) and bicycle-friendly measures (77.62%) for the site as well as the connections with the West Kowloon Cultural District to Jordan, Yau Ma Tei and Tai Kwok Tsui.
  2. 93.01% of respondents support environmental protection initiatives, such as energy saving, water use and reuse, using recyclable building materials, installing waste management and treatment facilities, etc. To implement initiatives to improve energy efficiency, environmental performance and achieving Government’s energy saving plan by 2025, all new development should have set goal to achieve HKGBC Beam Plus.
28 September

Public Consultation for Topside Development on XRL 高鐵站上蓋發展意見調查

XRL comparsion

new design

Designing Hong Kong Public consultation

Designing Hong Kong and a few Yau Tsim Mong District Council members would like to collect your views on the topside development on XRL.

Sun Hung Kai Properties submitted a re-application of building’s design and structure (Application No. A/K20/133) under section 12 (a) of the Town Planning Ordinance. If you have any concerns, please take this chance to comment to the Town Planning Board by Oct 9th.  Your views may improve the final design of the development.

Click here for the submission to Town Planning Board (deadline on Oct 09)

Click here for Designing Hong Kong public consultation

Click here for Proposed Topside Development by Masterplan Limited

Click here for Paper of the proposed Topside Development

For enquiry, please contact us at [email protected]

高鐵站上蓋發展意見調查

創建香港和油尖旺區議會議員希望就高鐵站上蓋發展收集你的意見。

新鴻基地產根據《城市規劃條例》第12(a)條提交了建築物的設計和結構的申請(申請編號A / K20 / 133)。請在10月9日之前向城市規劃委員會發表意見,或加入條件限制。你的意見可能會影響最終建築設計,從而改善社區發展。

改劃申請書及文件:請按此

意見調查:請按此

領賢規劃顧問有限公司提供的簡報(只備英文版):請按此

擬議西九龍站上蓋發展會議文件(只備英文版):請按此

 

18 April
2 March

Online Survey: Electronic Road Pricing
意見調查:電子道路收費

 

dhk-ERP-Pic-v3

Online Survey Findings 網上意見調查報告

調查日期 Survey period
2/3/2016 – 15/3/2016

We have received 375 responses to our survey. 期間共收到375份回覆。

dhk erp survey 1

 

 

dhk erp survey 2

Detailed report, please click the link below. 請按以下連結瀏覽全份意見調查報告。

DHK ERP survey report 16 March 2016

 

 

 

 

17/3/2016

 

 

 

————————————-
The government is consulting the public on its proposed pilot scheme for electronic road pricing in Central. (Click here for the public engagement document).

The deadline for comments is 18 March 2016.

Do you support the proposal? Object? Any views on the details? You can write to Government directly, or take part in our online survey (link: https://www.surveymonkey.com/r/VZ5DQ9S). Our office will consolidate and report the responses to the government.

In the meantime, please find below our CEO Paul Zimmerman’s personal view as published in Southside magazine – in short Paul proposes there is no charging for the use of Connaught/Gloucester Road Corridor, but for the use of the inner areas only.

Let us know your views.

政府正就中環電子道路收費先導計劃進行公眾諮詢。公眾諮詢截止日期為2016年3月18日。
諮詢文件:連結

你支持或反對道路收費計劃?你可直接向政府發表意見,或參與我們的網上意見調查(連結:https://www.surveymonkey.com/r/VZ5DQ9S)。我們會整合意見並向政府反映大家的睇法。

我們的行政總裁司馬文早前於Southside雜誌的專欄發表了他的個人意見。簡單而言,他建議干諾道及告士打道不設收費,收費區應設於中環的內街。

歡迎大家發表意見。

 

Southside Magazine – March 2016

2016-03-SS issuu

25 September

聯署支持電車行人專用區 Petition to support DVRC rezoning

現時港鐵港島區西線經已通車,未來數年沙中線及中環灣仔繞道亦會落成,正好提供一個契機設立電車及行人專區。藉著交通路線重組,可以改善中區多年交通擠塞及空氣污染等問題。

創建香港、健康空氣行動、長春社及香港地球之友,向城規會遞交改劃申請。方案提出,在德輔道中中心保留一條通道,讓環保交通工具如巴士和電車行駛。與德輔道中垂直的永和街、祖庇利街、砵甸乍街和畢打街等交通不受影響,讓汽車可以接連皇后大道中和干諾道中。

城規會現正邀請公眾就改劃提交意見,截止日期是2015年10月16日。
請即加入我們的聯署並支持改劃,讓德輔道中成為一個無污染、無擠塞的公共空間!
http://www.designinghongkong.com/forms/view.php?id=51951

English version:
 http://www.designinghongkong.com/forms/view.php?id=53589

MAP

2 August

Restrict Tour Coaches in Bays Area 限制旅遊巴出入海灣區

Please go to the link below to sign the petition:
請到以下連結參與聯署:
http://designinghongkong.com/forms/view.php?id=47407

25 March

More seats on the minibus 增加小巴座位

Please Sign Online Today! 請參與網上聯署!
We Will Write To The Government And Legislative Council With The Signatures Received.
收集簽名後,我們會去信政府及立法會表達訴求。

Go to: http://designinghongkong.com/forms/view.php?id=29063

 

More seats on the minibus

dhk minibus wp info

4 March
18 July

3rd Runway Concerns
有關機場擴建第三條跑道

Currently Hong Kong has over 80% of the international flights out of the Pearl River Delta. With the 3rd Runway proponents hope to maintain a large share of this growing market. But with only 7% of the population and manufacturing moving ever further land inwards, how sensible is that? The economic gains benefit a few, while the rest of the community pays. It is not just the money: Air pollution, noise, loss of marine habitat, and traffic – lots of it.

現在香港肩負珠角三角洲80%的國際航班,市場不斷擴大,機管局希望藉著擴建來增加利潤。但我們只有7%的人口,而本地工業持續北移,代表著甚麼?我們只有少數人受惠,所有卻為此而負上沉重的代價:空氣污染、噪音、失去海洋生態、交通流量大增……甚至更多

(more…)