青衣出行 Commute in TY
按此瀏覽「青衣出行」網頁
Click here to visit the website of Commute in TY
「⻘⾐出⾏」是⼀個由創建香港與葵青區議會社區營造工作小組合辦、由葵⻘區議會資助的社區項⽬,⽬的是在⻘⾐島推廣單⾞作為⽇常通勤的交通⼯具。這次項⽬旨在透過實地研究和舉辦社區活動,研究在⻘⾐區內可行的單⾞通勤路線,並教育不同道路使⽤者和公眾有關騎單⾞的文化禮儀和安全意識。
Commute in TY is a community project co-organized by Designing Hong Kong and the Community Building Working Group of the Kwai Tsing District Council. The project is funded by the Kwai Tsing District Council to promote cycling as a transportation mode for daily commute on Tsing Yi Island. The project aims to investigate and propose a cyclists’ commuting path in Tsing Yi, and to educate different road users and the public on the safety of cycling in Tsing Yi.
聯署支持修訂垃圾徵費條例草案,改善都市固體廢物管理 Let’s approve municipal solid waste charging
徵費、源頭分類、回收
三大元素,決一不可
議員聯署:https://docs.google.com/forms/d/e/1FAIpQLSdfolxAs44alWP0_dRCEAg_HS9gLB5s9MJA_sMXHDLqYr0LkA/viewform
公眾聯署:https://www.supporthk.org/?petition=%E6%94%B9%E5%96%84%E9%83%BD%E5%B8%82%E5%9B%BA%E9%AB%94%E5%BB%A2%E7%89%A9%E7%AE%A1%E7%90%86
政府曾在2013年制定目標,務求「在2022年將每日人均垃圾棄置量減至0.8公斤」。然而,垃圾棄置量不跌反升,更在2018年創新紀錄,每日人均垃圾棄置量達到1.53公斤。現有的回收計劃無法提高回收量,例如PET膠樽的出口回收率從8.5%(2016)大幅降至0.23%(2018)。三個戰略性堆填區面臨巨大壓力,並快將於2020年代末飽和。如果再不採取行動減少都市固體廢物,我們可能只靠覓地,以容納更多焚化爐或興建第四個堆填區,甚至犧牲郊野公園土地。屆時,我們需要作出更具政治敏感的決策。
垃圾徵費是政府回收塑膠和廚餘等廢物的相關政策的關鍵。回收、源頭分類和徵費是解決都市固體廢物的三大重要元素,決一不可。對比其他司法管轄區,香港的垃圾管理已大大落後。以往很多相關政策措施都是空談。延遲推出垃圾徵費將帶來不可想像的後果。如果垃圾徵費未能在來年施政處理,則只能在3-5年後重提。都市固體廢物將無法重大改善。
為改善香港的都市固體廢物管理,政府需採取以下的策略:
1. 應用策略於每種香港都市固體廢物 (立法會資料研究組,2019年): 廚餘 (34%)、廢紙 (24%)、塑膠垃圾 (20%) 和其他垃圾 (23%);
2. 應用「污者自付」、「源頭分類」 和 「生產者責任計劃」三大政策工具及理念,以解決都市固體廢物問題;
3. 每年撥款約8 至10 億元支持本地回收業,推動不同的減廢及回收措施;
4. 把垃圾徵費所得的資金用於本地回收業,達至可持續發展;
在採取垃圾徵費同時,創建香港建議以下廚餘和塑膠回收的相關措施:
立法規管和增加設施,以支持回收和廢物管理:
1. 將廚餘回收網絡擴展至全港18個區的食環署垃圾收集站和公屋;
2. 向各區私人屋苑提供資源、經濟誘因和定期維修服務,並為承辦商員工提供培訓,以達至可持續廚餘回收;
3. 投資廚餘回收技術,為回收業創造更多職位空缺,例如物流運輸和技術支援;
4. 提升公民減廢意識,教育公眾分類廚餘;
塑膠回收
1. 擴展「塑膠可回收物料回收服務先導計劃」至全港18區,推動公眾進行回收;
2. 就即棄膠樽實施生產者責任制;
3. 檢管即棄餐具;
4. 禁止在個人護理產品中使用微塑膠;
5. 禁止使用發泡膠盒;
6. 檢管食品過度包裝;
7. 檢視現有的公共飲水機的衛生情況,務求在肺炎疫情下,巿民能安心使用飲水機,並建立公共飲水機網絡。
Let’s approve municipal solid waste charging
Waste Levy, Source Separation, Recycling – 3 elements, not one less
DC/LC member petition: https://docs.google.com/forms/d/e/1FAIpQLSdfolxAs44alWP0_dRCEAg_HS9gLB5s9MJA_sMXHDLqYr0LkA/viewform
Public Petition: https://www.supporthk.org/?petition=lets-improve-our-municipal-solid-waste-management&lang=en
Background
In 2013, the government set the goal of ‘reducing the volume of daily disposal of garbage per capita to 0.8 kg in 2022’. Yet, per capita daily disposal of municipal solid waste (MSW) continues to increase every year. A record high of 1.53kg was reached in 2018. Under the current programs, recycling fails to improve. For example the export recycling rate of PET bottles fell from 8.5% (2016) to 0.23% (2018). Our three strategic landfills are under pressure and are about to saturate this decade. If nothing more is done to reduce MSW, we may have to explore new sites for incinerators or landfills. This would likely impact our country parks. Once the landfills are full, it will be politically difficult to stop this from happening.
The MSW Bill enabling charging is the linchpin in government’s waste policy and projects. Waste levies are important in promoting source separation of domestic waste and the successful expansion of our recycling capacity. Without waste charging, the separation and reduction of waste and the recovery of useful materials for recycling will fail. Hong Kong’s waste reduction management is already lagging behind other jurisdictions. Many policy initiatives have turned into broken promises. The delay of the waste charging bill will make it ever more difficult to achieve high levels of recycling. If the Bill is not dealt with within this term of government, the Bill will be delayed by 3-5 years. This unacceptable.
Improving Hong Kong’s municipal solid waste management requires key actions in the Policy Address:
- Strategies to address all types of municipal solid waste in Hong Kong (LegCo research paper, 2019): food waste (34%), paper waste (24%), plastic waste (20%) and others (23%);
- Reconfirm the principles: Polluters Pay, Source Separation of Waste, and Producers’ Responsibility;
- Allocate HKD 800-1000 million for waste reduction and recycling; and
- Apply the funds generated from waste charging in support of the recycling industry.
Implement legislation, regulations and infrastructure in support of recycling and waste management:
- Extend the collection network of food waste collection across 18 districts, to all FEHD Refuse Collection Point and public housing estates;
- Allocate resources and financial incentives for maintenance and contractor staff training for food waste collection in all private housing estates;
- Invest in food waste technology and create more jobs in recycling industry, e.g. logistic and technical support for food waste collection services;
- Educate the public on waste reduction and separation of food waste.
Plastic waste recycling
- Extend the pilot schemes of plastic collection to all 18 districts to provide convenience to the public;
- Implement the producer responsibility system for beverage (disposable) containers;
- Retrofit and expand public water dispensers for hygienic and COVID-proof bottle refilling;
- Regulate disposable tableware;
- Regulation of excessive packaging of food products;
- Ban the use of styrofoam and microplastic in personal care products
Topside development on XRL – Survey Result
We conducted a public opinion survey between September 28th to October 6th regarding the captioned application. 143 people submitted their responses.
The majority of the respondents objected expressing concerns over the relaxation of building height restrictions, deteriorating air ventilation, urban heat island effect, daylight access and visual intrusion.
By Friday Oct 9, please submit your comments to Town Planning Board at https://www.info.gov.hk/tpb/tc/plan_application/A_K20_133.html
廣深港高速鐵路西九龍總站用地
擬議辦公室、商業及零售發展並放寬建築物高度限制 (申請編號: A/K20/133)
9月28日至10月6日我們就以上題目,進行了公眾諮詢,並共有143人提交了回覆。
大部分受訪者表示反對放寬建築物高度限制,擔心會令空氣不流通,加劇城市熱島效應,影響日光和視覺效果。
請在10月9日之前向城市規劃委員會發表意見,或加入條件限制。你的意見可能會影響最終建築設計,從而改善社區發展。
- 62.94% of the respondents objected to the reflective exterior glass surface as it creates a glare which impairs the enjoyment of neighboring residents including particularly The Waterfront and The Austin. The glare may also impact nearby traffic. Solar reflections also raise temperatures and may impact vegetation nearby. Concerns were expressed over energy consumption for air-conditioning. The design is deemed does not match with the surrounding buildings.
- 71.33% of respondents are concerned over traffic impacts along Nga Cheung Road, Jordan Road and Canton Road. The proposed scheme proposed no less than 550 parking spaces for private cars. With the increase in parking spaces here and the car park at To Wah Road together with other developments in the area as well as new road connections such as the Central Kowloon Route, it is unclear whether the traffic burden exceeds capacity. Traffic congestion (and associated blaring of car horns) is experienced often in the area including along Jordan Road.
- 70.63% of respondents are concerned over the relaxation of building heights and the close distance between The Waterfront and XRL topside development. Such building structure would disturb daylight access, visual quality and air ventilation to inner area in Jordan.
- 76.22% of people object to relaxing height limit as this will set a bad precedent for nearby sites including future buildings at the WKCD. This application will set a precedent for others to change height restrictions. Respondents wonder if there is any justification of relaxing height limit after developers won bids for a site. Moreover, there is no compensation for the losses suffered by nearby residents. The gain would be simply for the developer at the cost of the neighbours.
- Although it is claimed that the proposed design has better air ventilation than the original scheme, 71.33% of respondents are concerned over the impact of having less fresh air and that pollutants residue in the community. It must be noted that the developer has failed to meet and consult the neighbours on the proposed plans.
- 49.65% of the respondents are worried over food and beverage related noise control at site, and the absence of clear operating guidelines on the use of facilities and time control of activities at the catering and commercial facilities (64.34%).
- 81.82% of the respondents are concerning over delivery of the promised public space. The promised public spaces are absent from the land lease conditions and may not be delivered. As seen throughout Hong Kong, what is promised in terms of public gains including public space, accessibility, public recreation, alfresco dining, etc, fails to be delivered. What controls will be applied by the Town Planning Board to ensure promised made are delivered?
- 86.71% of the respondents are upset with the lack of consultation and the failure to present and discuss the plans with nearby residents. Residents received insufficient information regarding the revised plans. Public consultation should have been conducted to provide clear information and to gain a better understanding. Moreover, the developer should introduce and discuss the proposal with the District Council before the deadline for comments under the Town Planning Ordinance for the captioned application.
- In the survey conducted, there is a demand for assessment of sustainability performance in terms of creating a ‘public realm’ which delivers a holistic and positive impact for occupants and neighbours. Reference is made to HKGBC BEAM Plus Neighborhood. More than 70% of respondents suggest civic spaces to be used by non-profit organizations for community activities (76.92%), promoting gender equality by introducing ‘Gender Mainstreaming checklist’ into the design and construction of the development (70.63%), and by adopting pet-friendly (78.32%) and bicycle-friendly measures (77.62%) for the site as well as the connections with the West Kowloon Cultural District to Jordan, Yau Ma Tei and Tai Kwok Tsui.
- 93.01% of respondents support environmental protection initiatives, such as energy saving, water use and reuse, using recyclable building materials, installing waste management and treatment facilities, etc. To implement initiatives to improve energy efficiency, environmental performance and achieving Government’s energy saving plan by 2025, all new development should have set goal to achieve HKGBC Beam Plus.
Public Consultation for Topside Development on XRL 高鐵站上蓋發展意見調查
Designing Hong Kong Public consultation
Designing Hong Kong and a few Yau Tsim Mong District Council members would like to collect your views on the topside development on XRL.
Sun Hung Kai Properties submitted a re-application of building’s design and structure (Application No. A/K20/133) under section 12 (a) of the Town Planning Ordinance. If you have any concerns, please take this chance to comment to the Town Planning Board by Oct 9th. Your views may improve the final design of the development.
Click here for the submission to Town Planning Board (deadline on Oct 09)
Click here for Designing Hong Kong public consultation
Click here for Proposed Topside Development by Masterplan Limited
Click here for Paper of the proposed Topside Development
For enquiry, please contact us at [email protected]
創建香港和油尖旺區議會議員希望就高鐵站上蓋發展收集你的意見。
新鴻基地產根據《城市規劃條例》第12(a)條提交了建築物的設計和結構的申請(申請編號A / K20 / 133)。請在10月9日之前向城市規劃委員會發表意見,或加入條件限制。你的意見可能會影響最終建築設計,從而改善社區發展。
改劃申請書及文件:請按此
意見調查:請按此
領賢規劃顧問有限公司提供的簡報(只備英文版):請按此
擬議西九龍站上蓋發展會議文件(只備英文版):請按此
機管局借錢起千億三跑,問過香港人未?
去信要求政府擱置第三條跑道計劃。